Construction takeoffs for subcontractors across Canada
You price the work.
We count it.
Senior quantity takeoffs for drywall, ceilings, flooring, painting, glazing, envelope, metals and concrete subs — measured in On-Screen Takeoff and Bluebeam Revu by a senior estimator. You keep your unit rates. We deliver the numbers you bid on.
- 15+ years senior estimating
- On time or 50% off
- CCDC-fluent
- No MEP — Div 21–28 excluded
Takeoffs built for subs
who know their own unit rates
You don't need someone else's pricing database. You need every square foot, lineal foot and each counted right — organized the way you bid. Nine trades, most CSI divisions, no mechanical or electrical. Pick yours:
Drywall & steel stud
Partitions by type mark with layers and ratings, framing LF, ceilings and bulkheads, insulation and shaftwall separated out.
Drywall takeoff services DIV 09 · ACOUSTICAL CEILINGSAcoustic ceilings
ACT areas by ceiling type and tile spec, grid LF, perimeter trim by condition, bulkheads and soffits, seismic bracing flagged.
ACT takeoff services DIV 09 · RESILIENT / CARPET / TILEFlooring
Every finish type by room and spec, base and transitions in LF, moisture mitigation flagged — waste factors stated, not buried.
Flooring takeoff services DIV 09 · COATINGSPainting
Wall and ceiling SF by substrate and finish system, doors and frames counted each side, specialty coatings separated.
Painting takeoff services DIV 08 · CURTAIN WALL / STOREFRONT / WINDOWSGlazing
Curtain wall by elevation, storefront and entrances, windows by type mark, glass makeups and perimeter sealant in LF.
Glazing takeoff services DIV 07 · ROOFING / CLADDING / INSULATION / BARRIERSRoofing & envelope
Roof areas by assembly, cladding and siding by elevation, insulation, air and vapour barriers, rainscreen components and flashings.
Envelope takeoff services DIV 05 · MISC & ORNAMENTALMisc metals
Guardrails and handrails by detail, stairs per flight, lintels and shelf angles, embeds and anchors counted each.
Misc metals takeoff services DIV 03 · CAST-IN-PLACE / FORMWORKConcrete & formwork
Volumes by element, formwork contact area, finishing by spec, joints in LF — foundations through to high-rise cast-in-place.
Concrete takeoff services DIV 06 · ROUGH CARPENTRY / WOOD FRAMEFraming
Wall and sheathing areas by wall type and floor from $600; a full lumber breakdown with piece counts and board footage from $1,500.
Framing takeoff servicesWhy quantities decide bids:
the exclusion you didn't catch
eats the margin you did.
Cheap takeoffs are cheap per job and expensive per error. One missed head-of-wall condition, one spandrel panel the schedule forgot, one moisture-mitigation allowance left open — and the job you won becomes the job you eat. Senior counting isn't a luxury. It's the margin.
How our takeoff service works:
drawings in, quantities out
Send your drawings
Drop a link — Dropbox, Drive, plan room, any format. A fixed price and a delivery date come back within 4 business hours. No meetings required.
Senior eyes measure everything
Measured in On-Screen Takeoff and Bluebeam Revu by a senior estimator — organized to CSI MasterFormat or your own cost codes, in metric or imperial. No juniors, nothing farmed out.
You price it and win it
Excel workbook plus marked-up plans showing every measured area. Drop in your unit rates and submit. One revision round and bid-period addenda included.
Sample takeoff deliverable:
see the file before you spend a dollar
Most takeoff services describe their deliverable. Here's ours to download — a full sample workbook on a fictitious office TI, in the real format.
| ITEM | AREA | DESCRIPTION | QTY | UNIT | RATE $ | AMOUNT |
|---|---|---|---|---|---|---|
| 1.1 | Lobby / Corr. | LVT 6mm glue-down | 2,140 | SF | your rate | — |
| 2.1 | Open office A | Carpet tile 50×50 ¼-turn | 6,420 | SF | your rate | — |
| 4.1 | Throughout | Rubber base 4" coved | 8,940 | LF | your rate | — |
| 6.1 | L1 SOG | Moisture mitigation | 4,200 | SF | your rate | — |
Yellow cells are yours. Enter unit rates — the workbook prices itself.
Colour-coded overlays straight from OST / Bluebeam — check any line yourself.
- Waste factors stated per material
- Basis of measurement, in writing
- Drawing conflicts flagged — Rm 214 plan vs schedule
- Exclusions listed, not implied
- Price placeholders (+15%) — bid-ready on arrival
- Quote template (+$150) — your number, looking sharp
- Same-day rush (+50%) when the clock's ugly
Open the actual file. Judge the format, the traceability, the assumptions page — before you send a single drawing.
Download the sample takeoff (.xlsx)A takeoff price
before the phone call
Pick your trade, drag to your project size, get a ballpark and a turnaround — right now. The written fixed quote (4 business hours) is the number that counts.
Ballpark from typical drawing sets. Same-day rush +50%. On time or 50% off — every job.
Full lumber breakdown: quoted per project, from $1,500.
Takeoff pricing, set like a bid form.
No surprises.
OR 50% OFF
| Item | Scope | From |
|---|---|---|
| 1.0 | Single-trade finish takeoff Flooring · painting · drywall & steel stud | $450 |
| 2.0 | Acoustic ceiling (ACT) takeoff Ceiling areas by type, grid, perimeter trim, bulkheads | $450 |
| 3.0 | Concrete & formwork — low-rise / small site Volumes, contact area, finishing, joints · high-rise cast-in-place quoted per project | $500 |
| 4.0 | Misc metals / Div 05 takeoff Rails, stairs, lintels, embeds by detail | $600 |
| 5.0 | Roofing & building envelope takeoff Roof assemblies, cladding, insulation, air/vapour barrier | $600 |
| 6.0 | Glazing takeoff — Div 08 Curtain wall, storefront, windows by type, glass makeups | $900 |
| 7.0 | Framing takeoff — wall & sheathing areas Wall SF and LF by wall type per floor, sheathing, openings | $600 |
| 7.1 | Framing takeoff — full lumber breakdown Piece counts, board footage, plates, studs, headers, hardware — quoted per project | $1,500 |
| 8.0 | Bid leveling / scope-gap analysis Sub-bid comparison matrix with exclusions caught | $600 |
| 9.0 | Change-order & claim quantity checks Independent verification of disputed quantities | $150/hr · 3-hr min |
| A | Add-ons Price placeholders +15% · quote template +$150 · rush (same-day) +50% | — |
$450 minimum engagement. Below that, an offshore takeoff mill will be cheaper — and you'll get what you pay for. SharpBid takes work where senior counting changes your number. Full breakdown on the takeoff pricing page.
Starter
- 2 takeoffs per month included
- Priority queue over one-off work
- 1 hr bid-strategy consult
- Addenda handled through bid period
Growth
- 4 takeoffs per month included
- Bid leveling included
- Next-business-day priority turnaround
- 2 hrs bid-strategy consult
Partner
- 6 takeoffs per month included
- Quantity QC on your in-house numbers
- Value-engineering quantity comparisons
- First-in-queue on everything
Overflow beyond included takeoffs: $120/hr · month-to-month, cancel anytime · unused takeoffs roll one month.
Your three takeoff options,
leveled
| Offshore takeoff mill | Hiring in-house | SharpBid | |
|---|---|---|---|
| Who counts | Junior, overseas, rotating | 1–3 yr estimator (if you can find one) | One senior estimator, 15+ years, every job |
| Local knowledge | Generic databases | Depends on hire | BC assemblies, coastal rainscreen detailing, local bid culture |
| Turnaround | 48–72 hrs, time-zone lag | When they get to it | Next business day · on time or 50% off |
| Cost | Cheap per job, expensive per error | A salaried estimator is paid in slow months too | From $450 per takeoff · retainers from $1,500/mo |
| When bids go quiet | — | Still on payroll | You pay nothing |
What a takeoff engagement
actually delivers
40,000 SF office TI
Resilient, carpet tile and base measured room by room against the finish schedule — moisture mitigation areas flagged, transitions in LF by condition, waste stated per material. Delivered next business day as workbook + marked plans.
Mid-rise residential tower
Every partition type mark quantified with layers, gauges and ratings, head-of-wall conditions separated, ceilings and bulkheads split out — so your labour crews price exactly what they'll build.
Guardrail & stair package
Rails by detail number in LF, stairs broken out per flight, embeds and anchors counted each against the structural set — a fabrication-ready quantity list, not a lump-sum guess.
Where we work:
takeoff services across Canada
SharpBid is based in Metro Vancouver and works for subcontractors right across the country. Nothing needs to be local: you send a drawings link, we measure in On-Screen Takeoff and Bluebeam Revu, and the workbook and marked-up plans come back by your deadline — in the units and cost codes you bid in.
British Columbia
Vancouver, the Fraser Valley, Victoria and Kelowna — six-storey wood-frame, mass timber, Step Code envelopes and coastal rainscreen assemblies.
AB · PRAIRIE VOLUMEAlberta
Calgary and Edmonton — steady wood-frame multifamily volume under the National Building Code – Alberta Edition.
ON · LARGEST MARKETOntario
Toronto/GTA and Ottawa — mid-rise wood-frame and concrete under the Ontario Building Code, in Canada's biggest construction market.
…and anywhere in Canada — everything is digital. Send drawings for a fixed quote.
The finish schedule says LVT-1, the plan tag says CPT-1. Whichever you priced, the other one shows up in the change order — against you.
The scope gaps that quietly kill bids — spotted for a living.
Takeoff service FAQs —
straight answers
What exactly do I get?
How much does a construction takeoff cost?
How does the on-time guarantee work?
Do you price the work too?
How fast is turnaround?
What software do you use?
What trades do you not cover?
What about revisions and addenda?
Is the sample takeoff from a real project?
Do you work outside Metro Vancouver?
Are quantities metric or imperial?
Why the $450 minimum?
Fixed takeoff quote in
4 business hours
Three fields. Send the drawings link — a fixed price and a guaranteed delivery date come back. No meetings, no sales pitch, no spam.