Construction estimating guides
Four working documents rather than four articles: what takeoffs actually cost and why the pricing models differ, two trade checklists you can run against a real set, and an honest comparison of outsourcing against hiring. No signup, no gate, no download form.
What a construction takeoff costs in Canada
The four pricing models you'll be quoted — per sheet, per square foot, hourly and fixed — what actually drives the cost, our published schedule, and the cases where outsourcing isn't worth it.
Read the guide CHECKLIST · DIV 09Drywall takeoff checklist
A working list to run against a real set: partition types, layers, heights, head-of-wall, deflection, ratings, shaftwall, bulkheads, ceilings, insulation, trims, access panels and backing.
Read the guide CHECKLIST · DIV 09Flooring takeoff checklist
Finish schedule against plans, room by room, patterns and direction, transitions, base, stair components, moisture mitigation, levelling — and how to state waste instead of burying it.
Read the guide DECISIONOutsourcing takeoffs vs an in-house estimator
The honest trade-off for a specialty sub: bid volume, peak periods, the real cost of a miss, quality control, confidentiality — and where hiring genuinely wins.
Read the guideSend the drawings.
Fixed quote in 4 hours.
Drop a link through the quote form or email info@sharpbid.ca. A fixed price and a guaranteed delivery date come back within 4 business hours.